What's New?

Check out our Bid Board for subcontractors and current bid information. Go >>

Read more about some of our latest works. Churches, Historical & Restoration, Pre-Engineered.

Bid NameDue Date/Time
 Martin Hangar Storm Damage Repairs at Martin State Airport 
The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: A. Work includes hazardous material removal by a qualified subcontractor of Levels 1 and 2 offices located in Hangar Nos. 1 and 2, and other Work indicated in the Contract Documents. a. Hazardous material inspection work has been performed under separate contract(s) with the Owner, as documented in Section 00 3126 "Existing Hazardous Material Information." b. Hazardous material removal and disposal includes materials containing asbestos and mold/mildew within the Project work limits. c. Remove and dispose of lead-containing materials to the extent disturbed by performance of the Work. Lead remediation throughout the entire Project work limits is not required. B. Work consists of selective demolition of Level 2 in Hangar No. 2. C. Restoration of lower levels of Hangar Nos. 1 and 2, including rough wood carpentry; gypsum board partitions and ceilings; acoustical panel ceilings; resilient tile flooring; resilient base; tile carpeting; painting. Existing mechanical, plumbing, electrical, and fire suppression systems are to remain, unless otherwise indicated on the Drawings. D. Add Alternates, to extent accepted by Owner, as described in Section 01 2300 "Alternates."
 All bids are due November 18th by COB
 November 18th COB
  
  

Click Here to View/Download Bid Files & Addendums From Trionfo Builders FTP

You May Also Get Bid Documents From ISQFT From Below Links