What's New?

Check out our Bid Board for subcontractors and current bid information. Go >>

Read more about some of our latest works. Churches, Historical & Restoration, Pre-Engineered.




Tuerk House Phase 3

Project scope consists of the interior renovation of 10,550 Sf on the first floor to be used as a commercial kitchen and office and the 2nd floor renovation area is to be used as a sleeping unit.

The first floor renovation area consists of a pharmacy, staff area, renovation of the existing commercial kitchen and ADA bathrooms.

The 2nd floor renovation area consists of 4 sleeping units and nurse stations, a supply room, 4 office spaces, a storage room, a laundry room and a janitor room.

All bids due November 2nd




November 2nd

Mary E Rodman Recreation Center

The project includes interior renovations to the existing recreational center building. Renovation of the building will include revised interior partitioning and doors, replacement ceiling and floor finishes etc. A small entry vestibule will be created at the main entrance. HVAC work shall reconfiguration of existing ductwork only as needed to accommodate new ceiling finish. Electric work shall include new/reconfigured lighting and power.

This is a wage rate project

Any questions email michael@trionfobuilders.com

There are 5 alternates on the project.

Addendum 1 has been posted

Addendum 2 has been posted



November 9th



                                   


Druid Hill Park Reptile House

 

Principal Items of work for this project are stabilization, restoration and interior renovation of the Reptile house in Druid Hill Park including demolition of the non-original rear addition, repair and restoration of the exterior (brick walls, stucco walls, concrete vaulting, tile roof, and original wood windows and doors), minor site work, new electrical and gas service, stabilization of the main floor structure, conservation of the historic vault, removal of existing partitions and fixtures, insertion of new partition walls, all new electrical, plumbing, and gas infrastructure, and HVAC and communication systems.

Addendum 1 has been posted


November 9th

Click Here to View/Download Bid Files & Addendums From Trionfo Builders FTP

You May Also Get Bid Documents From ISQFT From Below Links